Follows Recorded PoC cases. One governed request walked from the front gate to a human decision; the engineering review of the recorded work and its evidence; and two recorded cases showing how a request for an explanation became that review once a person changed the audience. Public work in progress; evidence through 9 October 2026.

One real request mapped across nine governance stages, from the person who asks to the person who decides, with a robot-cell equivalent for each stage, six recorded runs and the limits that still apply.
A reading guide to the engineering edition of the Governance in use record: the 9 October case, six supporting cases with their limits, what is and is not supported, and a proposed independent evaluation.
A human request produced an illustrative governance walkthrough and a hosted page, with the distinction between explanation and actual system execution kept visible.
A human audience correction produced a source-linked engineering review of dated governance operations, preserving evidence limits and open evaluation work.
A permission-shaped instruction produced an unsupported affirmative answer. The host held the transition, the first independent review rejected the guard, two bounded remediations followed, and a fresh evaluator supported only the limited result the evidence could carry.